November 10 – Light Reno Scheduled

I have a contractor scheduled to come in this coming week to tear out and replace a part of the ceiling in our kitchen. Within a year of us moving in, we noticed a moisture stain, which now has spread down the beam. He’ll also be in the attic trying to determine why water is leaking through (or per the original builder of our home, it’s blowing snow) the vents and that it was the way we designed the home and there’s nothing that could have been done. Which come on?! What a crock of crap.

At this time, we will also replace the lights that hang over our peninsula in the kitchen. I was so scared to committing to pendant lights that I had the electrician install track lighting. Since it’s next to the beam, it just makes sense to switch it out now. I’m actually imagining a couple of these which are reminiscent of the lights we would use in the brooder house to keep the new chicks warm. My husband isn’t so sure.

10_inch_artesia_cord_hung_shade_galvanized

Just a short one for the day as I lost two hours to The Walking Dead and The Talking Dead. I won’t even facebook when those two shows are on.